Search results

Jump to: navigation, search
  • Zac Trolley – Crew Engineer, GreenHab Officer [[Crew 188 Astronomy Reports]]
    8 KB (1,162 words) - 12:21, 24 March 2019
  • [[Category: Journalism Reports]] After that, Commander Corrales, EVA officer Piña and Greenhab engineer Reyes took the first EVA. The rest of the crew helped them to put
    10 KB (1,683 words) - 16:24, 7 March 2019
  • Reports to be filed: Sol Summary, Operations Report, Greenhab Report, Astronomy Report, Journalist Report Reports to be filed: Sol Summary, Operations Report, Greenhab Report, EVA report, Astronomy Report, Journalist Report, Final Science and
    24 KB (4,065 words) - 14:56, 7 March 2019
  • Reports to be filed: Sol Summary Report, Operations Report, GreenHab Report ...the hab from top to bottom for the incoming crew and close out all of our reports. We went through each of the buildings in the hab site and made sure everyt
    24 KB (3,979 words) - 19:31, 7 March 2019
  • [[Crew 192 EVA Reports]] [[Crew 192 GreenHab Reports]]
    7 KB (1,037 words) - 19:35, 7 March 2019
  • [[Category:Operations Reports]] Summary of GreenHab operations: –
    19 KB (2,636 words) - 10:15, 24 March 2019
  • [[Category:Operations Reports]] Summary of GreenHab operations: See GreenHab Report.
    30 KB (4,436 words) - 19:18, 7 March 2019
  • Reports filed: Reports to be filed:
    24 KB (4,008 words) - 19:04, 7 March 2019
  • ...aily routine and plan to conduct our first EVAs. Stay tuned for our future reports. We have two weeks of full of exciting projects coming up! We are ready for Reports to be filed: Sol Summary, EVA request, Operations Report, Greenhab Report, Journalist Report, HSO checklist, Crew Bios and pictures, mission p
    27 KB (4,563 words) - 12:34, 19 October 2019
  • [[Category:Operations Reports]] Water in GreenHab - ~ 148 gallons
    35 KB (5,282 words) - 18:47, 7 March 2019
  • [[Category:Operations Reports]] Summary of GreenHab operations: All nominal
    21 KB (2,979 words) - 11:07, 24 March 2019
  • Poni Bishop, GreenHab Officer [[Crew 194 Journalism Reports]]
    6 KB (925 words) - 18:40, 7 March 2019
  • [[Category: Operations Reports]] Summary of GreenHab operations: No problem
    28 KB (3,964 words) - 10:07, 24 March 2019
  • [[Category:Operations Reports]] Summary of GreenHab operations:
    30 KB (4,338 words) - 10:47, 24 March 2019
  • [[Category: Journalism Reports]] ...the ATV. In the afternoon, the commander Elizabeth did her first EVA, with Greenhab Engineer, Nolverth. Both collect different types of soil on Mars surfaces.
    10 KB (1,683 words) - 17:55, 7 March 2019
  • ..., I do setting up a Japanese automatic hydroponic machine called “foop” in GreenHab. Then also setting up my own hydroponic system. My system uses LED lights. [[Crew 191 - Operations Reports]]
    13 KB (2,098 words) - 10:03, 24 March 2019
  • ...EVA team had departed, Mark and Max began to harvest the microgreens from GreenHab. The EVA team returned with spectra and samples of the shales found in the Once the sun had set, the team rotated through GreenHab and the Science dome collecting, weighing and cataloging our bountiful harv
    34 KB (5,868 words) - 12:02, 24 March 2019
  • Hermes Bolivar – Greenhab Officer ...ould also like to thank all the Capcom officers who were ready to take our reports, comments, and bad jokes during these 2 weeks. And also, all the people beh
    11 KB (1,734 words) - 14:03, 7 March 2019
  • [[Category:Operations Reports]] Summary of GreenHab operations: Water saturated
    35 KB (5,296 words) - 18:48, 7 March 2019
  • [[Category:GreenHab Reports]] GreenHab Officer: Nathan Hadland
    25 KB (3,795 words) - 17:40, 7 March 2019

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)