Search results

Jump to: navigation, search
  • ...and ready to go by 10:30. Once outside a quick comm check and GPS position verification was conducted. It was quite a sight indeed, watching three figures in their ...aken from the samples gathered from EVA 13 and 14 at the Seep site.  While verification of species is uncertain, it is clear that life is present in these alkaline
    173 KB (29,116 words) - 08:06, 29 October 2019
  • ...crewmember drove to Grand Junction yesterday to buy the second pump, which failed immediately (within 5 minutes) today on EVA installation. This brand and si ...r grows on it is suspected of being able to use that substance upon future verification experiments. Screwcap tubes are small and it is critical to keep the lip of
    118 KB (20,168 words) - 17:24, 16 March 2020
  • waypoint verification ...ne success at waypoint 32. Other attempts, on both frequencies 200 and 201 failed.
    255 KB (43,372 words) - 17:24, 16 March 2020
  • Last but not least, my camera failed due to dust getting into the telescoping mechanism. I had kept it out and u ...tances:''' Winds gusting to about 30mph from the west. Radio communication failed at start of EVA between EVA personnel but Commander to HabCom was successfu
    287 KB (46,756 words) - 18:19, 19 December 2019