Line 2: | Line 2: | ||
[https://sites.google.com/a/marssociety.org/mdrs2013/home/crew-167/0406-engineeringreport April] 6, 2016 | [https://sites.google.com/a/marssociety.org/mdrs2013/home/crew-167/0406-engineeringreport April] 6, 2016 | ||
+ | |||
Crew Engineer Name: Jonathan Beechner | Crew Engineer Name: Jonathan Beechner | ||
Line 23: | Line 24: | ||
[https://sites.google.com/a/marssociety.org/mdrs2013/home/crew-167/0407-engineeringreport April] 7, 2016 | [https://sites.google.com/a/marssociety.org/mdrs2013/home/crew-167/0407-engineeringreport April] 7, 2016 | ||
+ | |||
Crew Engineer Name: Jonathan Beechner | Crew Engineer Name: Jonathan Beechner | ||
Line 44: | Line 46: | ||
[https://sites.google.com/a/marssociety.org/mdrs2013/home/crew-167/0408-engineeringreport April] 8, 2016 | [https://sites.google.com/a/marssociety.org/mdrs2013/home/crew-167/0408-engineeringreport April] 8, 2016 | ||
+ | |||
Crew Engineer Name: Jonathan Beechner | Crew Engineer Name: Jonathan Beechner | ||
Line 92: | Line 95: | ||
Power: Still on cat. | Power: Still on cat. | ||
− | [https://sites.google.com/a/marssociety.org/mdrs2013/home/crew-167/0411-engineeringreport April] 11, April | + | [https://sites.google.com/a/marssociety.org/mdrs2013/home/crew-167/0411-engineeringreport April] 11, April |
+ | |||
Crew Engineer Name: Jaxom Hartman | Crew Engineer Name: Jaxom Hartman | ||
Line 147: | Line 151: | ||
Power: Still on cat. | Power: Still on cat. | ||
− | + | [https://sites.google.com/a/marssociety.org/mdrs2013/home/crew-167/0413-engineeringreport<nowiki> April] 13, 2016</nowiki> | |
+ | |||
Crew Engineer Name: Jaxom Hartman | Crew Engineer Name: Jaxom Hartman | ||
Line 172: | Line 177: | ||
Questions and Concerns to Mission Support: Currently conserving water. No further concerns aside from water shortages. Power: Still on cat | Questions and Concerns to Mission Support: Currently conserving water. No further concerns aside from water shortages. Power: Still on cat | ||
− | [https://sites.google.com/a/marssociety.org/mdrs2013/home/crew-167/0414-engineeringreport April] 14, 2016 | + | [https://sites.google.com/a/marssociety.org/mdrs2013/home/crew-167/0414-engineeringreport April] 14, 2016 |
+ | |||
Crew Engineer Name: Jaxom Hartman | Crew Engineer Name: Jaxom Hartman | ||
Line 198: | Line 204: | ||
[https://sites.google.com/a/marssociety.org/mdrs2013/home/crew-167/0415-engineeringreport April] 15, 2016 | [https://sites.google.com/a/marssociety.org/mdrs2013/home/crew-167/0415-engineeringreport April] 15, 2016 | ||
+ | |||
Crew Engineer Name: Jaxom Hartman | Crew Engineer Name: Jaxom Hartman | ||
Revision as of 17:21, 7 March 2019
April 6, 2016
Crew Engineer Name: Jonathan Beechner
Diesel – 50% Propane – 35% Gasoline (5 Gallon containers for ATV) – 1 full container, 1 half full container
Water (trailer) measured in cm from the bottom – NA Water (static) measured in cm from the bottom – 24.5in / 42in Trailer to Static Pump used – Yes Water (loft) – 47 gallons Static to Loft Pump used – 64 gallons Water Meter: 107263,1 gallons
Summary of Engineering activities: Routine check, filled ATV’s 1, 2, and 3 with gas. D. G. came and took the trailer. I emptied the tank before he left. He also took the diesel container and left another container of gas. Questions and Concerns to Mission Support: No Power: No word from Shannon today. Presumably still on cat.
Jonathan Beechner Crew Engineer
April 7, 2016
Crew Engineer Name: Jonathan Beechner
Diesel – 50% Propane – 35% Gasoline (5 Gallon containers for ATV) – 1 full container, 1 half full container
Water (trailer) measured in cm from the bottom – 42in / 42in Water (static) measured in cm from the bottom – 18in / 42in Trailer to Static Pump used – No Water (loft) – 47 gallons Static to Loft Pump used – 81 gallons Water Meter: 107379,0 gallons
Summary of Engineering activities: Routine check, trailer was returned by D. G., repaired air pack (battery was not connected to main circuit). Questions and Concerns to Mission Support: No Power: Power reset at 5:00 PM, no oil added, still on cat.
Jonathan Beechner Crew Engineer
April 8, 2016
Crew Engineer Name: Jonathan Beechner
Diesel – 50% Propane – 35% Gasoline (5 Gallon containers for ATV) – 2 full containers
Water (trailer) measured in cm from the bottom – 42in / 42in Water (static) measured in cm from the bottom – 12in / 42in Trailer to Static Pump used – No Water (loft) – 47 gallons Static to Loft Pump used – 61 gallons Water Meter: 107497,7 gallons
Summary of Engineering activities: Routine check. Filled ATV’s with gas. Questions and Concerns to Mission Support: None Power: Still on cat.
Jonathan Beechner Crew Engineer
April 10, 2016
Crew Engineer Name: Jaxom Hartman
Diesel – 45%
Propane – 34%
Gasoline (5 Gallon containers for ATV) – 1 and a half full containers
Water (trailer) measured in cm from the bottom – 0 in / 42in
Water (static) measured in cm from the bottom – 30 in / 42in
Trailer to Static Pump used – No
Water (loft) – 47 gallons
Static to Loft Pump used – 70 gallons
Water Meter: 0107659,6 gallons
Summary of Engineering activities: Routine check. Filled ATV’s with gas.
Questions and Concerns to Mission Support: Low water pump pressure to basement inhibits toilet operation. Manual flush still functional. Trailer tank needs refilling.
Power: Still on cat.
April 11, April
Crew Engineer Name: Jaxom Hartman
Diesel – 45%
Propane – 32%
Gasoline (5 Gallon containers for ATV) – 1.25 containers
Water (trailer) measured in cm from the bottom – 0 in / 42in
Water (static) measured in cm from the bottom – 28.5 in / 42in
Trailer to Static Pump used – No
Water (loft) – 43 gallons
Static to Loft Pump used – 27 gallons
Water Meter: 0107699,1 gallons
Summary of Engineering activities: Routine check. Filled ATV’s with gas. Thank you for the feedback, the water pressure trouble was resolved by cleaning the filter.
Questions and Concerns to Mission Support: One gas can’s spout cracked during ATV refill and is in need of replacement.
Power: Still on cat. Power was shut off for two minutes for the generator’s routine oil check at 5:54pm.
April 12, 2016
Crew Engineer Name: Jaxom Hartman
Diesel – 42%
Propane – 32%
Gasoline (5 Gallon containers for ATV) – 1.25 gas containers
Water (trailer) measured in cm from the bottom – 20.5 in / 42in
Water (static) measured in cm from the bottom – 0 in / 42in
Trailer to Static Pump used – No
Water (loft) – 40 gallons
Static to Loft Pump used – 124.5 gallons
Water Meter: 0107836.3 gallons
Summary of Engineering activities: Routine check. Filled ATV’s with gas.
Questions and Concerns to Mission Support: Current trends indicate that water supplies will not last the duration of our stay. We will need more water in the next couple of days.
Power: Still on cat.
[https://sites.google.com/a/marssociety.org/mdrs2013/home/crew-167/0413-engineeringreport April] 13, 2016
Crew Engineer Name: Jaxom Hartman
Diesel – 40%
Propane – 32%
Gasoline (5 Gallon containers for ATV) – 1 container
Water (trailer) measured in cm from the bottom – 16.25 in / 42in
Water (static ) measured in cm from the bottom – 0 in / 42in
Trailer to Static Pump used – No
Water (loft) – 48 gallons
Static to Loft Pump used – 55 gallons
Water Meter: 0107895,6 gallons
Summary of Engineering activities: Routine check. Filled ATV’s with gas.
Questions and Concerns to Mission Support: Currently conserving water. No further concerns aside from water shortages. Power: Still on cat
April 14, 2016
Crew Engineer Name: Jaxom Hartman
Diesel – 37.5%
Propane – 32%
Gasoline (5 Gallon containers for ATV) – ½ container
Water (trailer) measured in cm from the bottom –33 in / 42in
Water (static) measured in cm from the bottom – 14 in / 42in
Trailer to Static Pump used – No
Water (loft) – 25 gallons
Static to Loft Pump used – 48 gallons
Water Meter: 0107960,7 gallons
Summary of Engineering activities: Routine check. Filled ATV’s with gas.
Questions and Concerns to Mission Support: Water resupply received. Thank you. Power: Still on cat.
April 15, 2016
Crew Engineer Name: Jaxom Hartman
Diesel – 35%
Propane – 31%
Gasoline (5 Gallon containers for ATV) – less than 1/4 container
Water (trailer) measured in cm from the bottom –33 in / 42in
Water (static) measured in cm from the bottom – 9 in / 42in
Trailer to Static Pump used – No
Water (loft) – 45 gallons
Static to Loft Pump used – 80 gallons
Water Meter: 0108013,6 gallons
Summary of Engineering activities: Routine check. Filled ATV’s with gas.
Questions and Concerns to Mission Support: During the rain, a small leak was discovered on the window of the northern room (farthest right of the 6). From what I can see, the leak is coming from the sill and not from the ceiling or higher up on the wall. No water damage was incurred thanks to a towel.
Power: Still on cat.