Crew 169 - Team Peru IV Operations Reports

From Marspedia
Revision as of 16:12, 7 March 2019 by NathanielFromMars (talk | contribs) (Created page with "Category: Operations Reports [https://sites.google.com/a/marssociety.org/mdrs2013/home/crew-169-team-peru-ivi/0503-engineeringreport May] 3, 2016 Elizabeth Centurion: In...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search


May 3, 2016

Elizabeth Centurion: Installed the electronic system for the Autonomus Drip System and installed the pips with tapes.

Orson Lazo: Prepared the components and the systems for the second EVA`s for tomorrow. Testing and repair the circuits for the correct charge of the oxygen tanks and check the radio system.

Marcos Bruno: Had some problems with rover’s battery. Installed the user interface for the camera and the remote control system.

Celeste Balladares: I’ve resolved the joints coordination movement, but not fineshed yet the two servomotor adaptation.

Nolverth Huaman: Acondition for green hab and the seats for then plants them.

Luis Ibañez: Obtained the principal measurements of the hub and now work in a computer design.


May 5, 2016

Crew Engineer: Walter Orson Lazo Pazce Diesel – n/a Propane – n/a Gasoline (5 Gallon containers for ATV) – 9 gallons Water (trailer) measured in cm from the bottom– n/a Water (static) measured in cm from the top – 51 centimeters Trailer to Static Pump used – 0 Water (loft) – Static to Loft Pump used – 46 liters Water Meter: 20L Atv # Oil Checked: OK Atv # Fuel Used Gals: 0 Atv # Tires Status: OK Atv # Hours Used Day: 0 hours Atv # 0

EngSupPower Report - Temporary Outage 05/05/2016

Power Outage Type: unexpected Power Fail Date: May 5th, 2016 Power Fail Time: 10:00 hours aprox. Power Back Date: May 5th, 2016 Power Back Time:15:00 hours aprox. Standby Gen Used: Yes Standby On Time: 15:00 hours aprox. Standby Off Time: Not yet, it is the only one we have Hal Server Restarted: Yes Water Heater Restarted: Yes Smoke Alarms Tested: No Notes and Comments: Not yet

Summary of Team Engineering activities:

Elizabeth Centurion: Completed electronic and mechanic components of project. Orson Lazo: Validating the choice muscles of the legs and the arms that he obtained; how conclusions trough of two EVA`s elaborated. Marcos Bruno: In his first EVA, he tested the connectivity, movement and the function of the step motors installed in the tool. Needs some optimization. Celeste Balladares: Support Marcos' EVA. Check robot programming. Nolverth Huaman: Sample seed germination dates observed and recorded. Luis Ibañez: Enhance virtual model trough software of CFD (Computer Fluid Dynamics) for the simulation of air around theHab. Jeel Moya: Test the samples of two subjects of study for his project. Create a list with the things of the pharmacy box.

Questions and Concerns to Mission Support: Temporary generator outage resolved by Crew Engineer.


May 6, 2016

Crew Engineer Name: Walter Orson Lazo Pazce Diesel – n/a Propane – n/a Gasoline (5 Gallon containers for ATV) – 9 gallons Water (trailer) measured in cm from the bottom– n/a Water (static) measured in cm from the top – 40 centimeters Trailer to Static Pump used – 0 Water (loft) – Static to Loft Pump used – 35 liters Water Meter: 20 centimeters Atv # Oil Checked: OK Atv # Fuel Used Gals: 0 Atv # Tires Status: OK Atv # Hours Used Day: 0 hours Atv # 0

Summary of Engineering activities: The work of the team today was: Elizabeth Centurion: Check the configuration of the drip system, verification: the bottle for the river system didn`t use because it`s not necessary yet. Orson Lazo: EVA`s requirement was not approved, and his project will be delay. He need two more EVA`s for finish his project. Marcos Bruno: Check the results obtained in his first EVA`s. Celeste Balladares: A motor shield controller for sixteen motors function only, and her robot have eighteen servo-motors. For this reason she will work only with sixteen freedom degrees for the mobility and then she does the testing step. Nolverth Huaman: Dates observed of the different samples of seats in germination. Do a checklist of the things of the laboratory at the first floor. Luis Ibañez: Design the virtual model trough software of CFD (Computer Fluid Dynamics) for the simulation of air around the Hab. Jeel Moya: Observation and analysis of two samples obtained trough of the clothes of two crew members.


May 8, 2016

Crew Engineer Name: Walter Orson Lazo Pazce

Diesel – Full, 100%

Propane – 75%

Gasoline (5 Gallon containers for ATV) – Actually we have 9 gallons

Water (trailer) measured in cm from the bottom– 50 centimeters

Water (static) measured in cm from the top – 52 centimeters

Trailer to Static Pump used – 0

Water (loft) – Static to Loft Pump used – 86

Water Meter: 0.45

Atv # Oil Checked: Ok

Atv # Fuel Used Gals: 0

Atv # Tires Status: That’s ok,

Atv # Hours Used Day: 0 hours

Atv # 0

Notes and Comments: Not yet

Summary of Engineering activities: The work of the team today was:

Elizabeth Centurion: Check the two flower pots of the drip autonomus system. She tested the pots indoor, in the HUB.

Orson Lazo: Does the four and final EVA`s for test the electrodes in the chest. Repair the 3D Printer Cube model for our and other crews.

Marcos Bruno: Build and repair different components for a better function of his rover robot.

Celeste Balladares: Corrected the mistake of the serials communication ports of the arduinos. An arduino send dates and the other arduino receives dates.

Nolverth Huaman: Support the EVA`s of the crew engineer. Wait the results of his samples.

Luis Ibañez: The computer design in the CFD program (Computer Fluid Dynamics) of the HUB advanced in 70%. Tomorrow elaborate the EVA`s.

Jeel Moya: Obtained results in the experimentation: he found bacteria in the clothes of the team.

Questions and Concerns to Mission Support: The leaking water is controlled.


May 9, 2016

Crew Engineer Name: Walter Orson Lazo Pazce

Diesel – Full, 100%

Propane – 70%

Gasoline (5 Gallon containers for ATV) – Actually we have 9 gallons

Water (trailer) measured in cm from the bottom– 50 centimeters

Water (static) measured in cm from the top – 42 centimeters

Trailer to Static Pump used – 0

Water (loft) – Static to Loft Pump used – 79

Water Meter: 0.45

Atv # Oil Checked: Ok

Atv # Fuel Used Gals: 1

Atv # Tires Status: That’s ok, DJ repared and installed a tire of an ATV

Atv # Hours Used Day: 2 hours

Atv # 1, 2 and 3

Notes and Comments: Not yet

Summary of Engineering activities: The work of the team today was:

Elizabeth Centurion: Monitoring the humidity in the samples of soil.

Orson Lazo: Started the report of his project, with the testing elaborated.

Marcos Bruno: Elaborated the second EVA`s for test the mobility of the rover robot. Problems in the connectivity.

Celeste Balladares: Now she needs elaborate more test for her EVA`s of tomorrow and test the serial communication ports.

Nolverth Huaman: Check the results of his samples and elaborated some conclusions.

Luis Ibañez: The computer design in the CFD program (Computer Fluid Dynamics) of the HUB advanced in 80%. Obtained the final measures in his EVA`s for the computer model.

Jeel Moya: Obtained samples of the rover and his driver for evaluate and elaborate other study.

Questions and Concerns to Mission Support: Not Yet.


May10, 2016

Crew Engineer Name: Walter Orson Lazo Pazce Diesel – Full, 100% Propane – 60% Gasoline (5 Gallon containers for ATV) – 8 gallons Water (trailer) measured in cm from the bottom– 50 centimeters Water (static) measured in cm from the top – 42 centimeters Trailer to Static Pump used – 0 Water (loft) – Static to Loft Pump used – 20 Water Meter: 0.40 Atv # Oil Checked: OK Atv # Fuel Used Gals: 1 Atv # Tires Status: OK Atv # Hours Used Day: 1 hour, yesterday not used. Atv # 1, 2 and 3 Notes and Comments: None today. Summary of Engineering activities: The work of the team today was: Elizabeth Centurion: Monitoring the humidity in the samples of soil. Orson Lazo: Elaborated the final conclusions of the measures that he obtained in all the EVAs. Inventory of the tools of the HUB: Laboratory and Work Zones. Marcos Bruno: Repaired and tested the optimum distance for obtain clear communication between the Rover with the computer (the control center). Celeste Balladares: Developed the first EVAs. Check and verification of the communication trough serial ports. The hexapodous robot could move in the plane terrain. Nolverth Huaman: Started the article about his project and his results of the samples. Luis Ibañez: Simulations in different velocities of the air around the HUB in base of the measures obtained in his EVAs. Jeel Moya: Schedule his new EVA for tomorrow for obtain more samples. Questions and Concerns to Mission Support: None

May 11, 2016

Crew Engineer Name: Walter Orson Lazo Pazce

Diesel – Full, 100%

Propane – 50%

Gasoline (5 Gallon containers for ATV) – Actually we have 6 gallons

Water (trailer) measured in cm from the bottom– 0 centimeters

Water (static) measured in cm from the top – 30 centimeters

Trailer to Static Pump used – 1

Water (loft) – Static to Loft Pump used – 65

Water Meter: 0.55

Atv # Oil Checked: Ok

Atv # Fuel Used Gals: 2

Atv # Tires Status: That’s ok

Atv # Hours Used Day: 2 hours

Atv # 1, 2, 3 and 4.

Notes and Comments: Not yet

Summary of Engineering activities: The work of the team today was:

Elizabeth Centurion: Monitoring the humidity in the samples of soil and controlled the growth of the seeds in her flowerpots. It have already germinated.

Orson Lazo: Support and guide in the EVA of Jeel, Marcos and Elizabeth. Obtained the final results of my project: The muscles that will generate more electricity with the triboelectric generators in the body will be: pectoralis major, rectus abdominis, biceps brachii, triceps brachii, rectus femoris and gastrocnemius.

Marcos Bruno: Tested the control system in different spaces for move the rover.

Celeste Balladares: Prepared the IMU system for the implementation in the movement of the hexapodous.

Nolverth Huaman: Continued the article about his project and his results of the samples.

Luis Ibañez: Simulations in different velocities of the air around the HUB in base of the measures obtained in his EVA`s.

Jeel Moya: Schedule of his new EVA`s for tomorrow for obtain more samples.

Questions and Concerns to Mission Support: Not Yet.

May 12, 2016

Crew Engineer Name: Walter Orson Lazo Pazce

Diesel – Full, 100%

Propane – 40%

Gasoline (5 Gallon containers for ATV) – Actually we have 4 gallons

Water (trailer) measured in cm from the bottom– 0 centimeters

Water (static) measured in cm from the top – 20 centimeters

Trailer to Static Pump used – 1

Water (loft) – Static to Loft Pump used – 90

Water Meter: 0.45

Atv # Oil Checked: Ok

Atv # Fuel Used Gals: 2

Atv # Tires Status: That’s ok

Atv # Hours Used Day: 2

Atv # 1, 2, 3 and 4

Notes and Comments: Today when we used the ATV`s for the film of the BBC`s program and a crew member broken the down light of the ATV.

Summary of engineering activities: The work of the team today was: (Limit works, because we support the note for the BBC).

Elizabeth Centurion: Evaluated the results obtained in the samples of soil.

Orson Lazo: Support the project of Celeste for optimize the mobility of the heorixapodous robot. Demonstrate the function of the ATV`s for the BBC.

Marcos Bruno: Elaborated a little test and demonstrate the functions of the rover for the BBC.

Celeste Balladares: Testing the mobility of the hexapodous robot with the use of the IMU system.

Nolverth Huaman: Obtained more samples and advanced the conclusions.

Luis Ibañez: Finish the computer model trough the fifty percentage of his dates obtained.

Jeel Moya: Tomorrow finish the samples that he need obtain for his project.


May 13, 2016

Crew Engineers: Walter Orson, Lazo Pazce

Diesel – Full, 100% Propane – 30% Gasoline (5 Gallon containers for ATV) - 4 gallons Water (trailer) measured in cm from the bottom– 0 centimeters Water (static) measured in cm from the top – 15 centimeters Trailer to Static Pump used – 1 Water (loft) – Static to Loft Pump used – 95 Water Meter: 0.40 Atv # Oil Checked: OK Atv # Fuel Used Gals: 0 Atv # Tires Status: OK Atv # Hours Used Day: 0 Atv # n/a

Notes and Comments: n/a

Summary of engineering activities:

Elizabeth Centurion: Final evaluation of the soils and obtained conclusions of the germinated plants. Orson Lazo: Support the project of Celeste for optimize the communication between the IMU System with the control system of the hexapodous robot. Obtained the final conclusions and the results of his objectives are successful. Marcos Bruno: Evaluated the range of the communication system. The functions of the robot have good operation. Celeste Balladares: Tested the IMU system with the functionality of the hexapodous robot trough steep slope. Nolverth Huaman: Tested and worked in the final samples. Luis Ibañez: Finish the computer model trough the one hundred percentage of his dates obtained. Jeel Moya: Obtained final samples and tested for discover other bacteria.