Crew 189 Operations Reports

From Marspedia
Jump to: navigation, search


POSTED ONMARCH 10, 2018 Operations Report – Match 10th [category operations-report]

Crew 189 Operations Report 10March2018

SOL: 20

Name of person filing report: Gabriel PAYEN

Non-nominal systems: –

Notes on non-nominal systems: –

Generator (hours run): Turned off at 10:00AM and turned on at 6:30PM

Solar— SOC 71 % (Before generator is run at night)

Diesel – %

Propane – psi.

Ethanol Free Gasoline (5 Gallon containers for ATV) – 5 gallons.

Water (trailer) – 0 gallons.

Water (static) – 450 gallons

Trailer to Static Pump used – NO

Water (loft) – Static to Loft Pump used – YES

Water Meter: 131 903.2

Toilet tank emptied: NO

ATV’s Used: 1,2,3 & Honda

Oil Added : YES

ATV Fuel Used: Gals

Hours the ATVs were Used today: 2 hours

Notes on ATVs: –

Deimos rover used: YES

Hours: 116.6

Beginning charge: 100%

Ending charge: 85%

Currently charging: YES

Sojourner rover used: ASSIGNED TO DIRECTOR

Hours:

Beginning charge:

Ending charge:

Currently charging:

Spirit rover used: NO

Hours:

Beginning charge:

Ending charge:

Currently charging:

Opportunity rover used: YES

Hours: 19.5

Beginning charge: 100%

Ending charge: 57%

Currently charging: YES

Curiosity rover used: NO

Hours:

Beginning charge:

Ending charge:

Currently charging:

HabCar used and why, where –

General notes and comments: –

Summary of internet: –

Summary of suits and radios: –

Summary of Hab operations:

Cleaned and tidy up

Summary of GreenHab operations:

Cleaned and tidy up

Summary of ScienceDome operations:

Backpack 7 and 10 sent back from the Hab to the ScienceDom

Cleaned and tidy up

Summary of RAMM operations:-

Summary of health and safety issues: –

Questions, concerns and requests to Mission Support: –


POSTED ONMARCH 6, 2018 Operations Report – March 6th Crew 189 Operations Report 6March2018

SOL: 16

Name of person filing report: Gabriel PAYEN

Non-nominal systems: –

Notes on non-nominal systems: –

Generator (hours run): Turned off at 09:AM and turned on at 6:20PM

Solar— SOC 72 % (Before generator is run at night)

Diesel – 47 %

Propane – 21 psi.

Ethanol Free Gasoline (5 Gallon containers for ATV) – 9.5 gallons.

Water (trailer) – 0 gallons.

Water (static) – 500 (90%) gallons

Trailer to Static Pump used – NO

Water (loft) – Static to Loft Pump used – YES

Water Meter: 131 724.2

Toilet tank emptied: NO

ATV’s Used: 350.2 & 350.3

Oil Added : NO

ATV Fuel Used: Gals

Hours the ATVs were Used today: 3

Notes on ATVs: –

Deimos rover used: YES

Hours: Start : 112.7 , End : 113.8

Beginning charge: 100%

Ending charge: 86%

Currently charging: YES

Sojourner rover used: ASSIGNED TO DIRECTOR

Hours:

Beginning charge:

Ending charge:

Currently charging:

Spirit rover used: YES

Hours: Start : 21.9 , End : 23

Beginning charge: 100%

Ending charge: 70%

Currently charging: YES

Opportunity rover used: NO

Hours:

Beginning charge: 100

Ending charge: –

Currently charging: NO

Curiosity rover used: NO

Hours: 18

Beginning charge: 100%

Ending charge: –

Currently charging: NO

HabCar used and why, where : used to get aquaponics supplies and packages from crew 190

General notes and comments: –

Summary of internet: –

Summary of suits and radios: –

Summary of Hab operations: –

Summary of GreenHab operations:

Summary of ScienceDome operations: –

Summary of RAMM operations:-

Summary of health and safety issues: –

Questions, concerns and requests to Mission Support: –

POSTED ONMARCH 5, 2018 Operations Report – March 5th Hello CapCom, hello Graeme,

Here is my Operations Report for sol 15 :

Crew 189 Operations Report 5March2018

SOL: 15

Name of person filing report: Gabriel PAYEN

Non-nominal systems: –

Notes on non-nominal systems: –

Generator (hours run): Turned on at 8:20 AM and turned off at 7:00 PM

Solar— SOC 79 % (Before generator is run at night)

Diesel – 48 %

Propane – 23 psi.

Ethanol Free Gasoline (5 Gallon containers for ATV) – 10 gallons.

Water (trailer) – 0 gallons.

Water (static) – 500 gallons (90/95%)

Trailer to Static Pump used – NO

Water (loft) – Static to Loft Pump used – YES

Water Meter: 131 684.0

Toilet tank emptied: YES

ATV’s Used: 1,2,3 & Honda

Oil Added : NO

ATV Fuel Used: Gals

Hours the ATVs were Used today: 2h30

Notes on ATVs: –

Deimos rover used: NO

Hours: 113.2

Beginning charge: 100%

Ending charge: –

Currently charging: NO

Sojourner rover used: ASSIGNED TO DIRECTOR

Hours:

Beginning charge:

Ending charge:

Currently charging:

Spirit rover used: NO

Hours: 22.4

Beginning charge: 100%

Ending charge: –

Currently charging: YES

Opportunity rover used: NO

Hours: 18.0

Beginning charge: 100%

Ending charge: –

Currently charging: YES

Curiosity rover used: NO

Hours: 15.4

Beginning charge: 100%

Ending charge: –

Currently charging: NO

HabCar used and why, where –

General notes and comments: –

Summary of internet: –

Summary of suits and radios: –

Summary of Hab operations: –

Summary of GreenHab operations:

Summary of ScienceDome operations: –

Summary of RAMM operations:-

Summary of health and safety issues: –

Questions, concerns and requests to Mission Support: –

POSTED ONMARCH 5, 2018 Operations Report – November 25th Hello CapCom, hello Graeme,

Here is my Operations Report for sol 15 :

Crew 189 Operations Report 5March2018

SOL: 15

Name of person filing report: Gabriel PAYEN

Non-nominal systems: –

Notes on non-nominal systems: –

Generator (hours run): Turned on at 8:20 AM and turned off at 7:00 PM

Solar— SOC 79 % (Before generator is run at night)

Diesel – 48 %

Propane – 23 psi.

Ethanol Free Gasoline (5 Gallon containers for ATV) – 10 gallons.

Water (trailer) – 0 gallons.

Water (static) – 500 gallons (90/95%)

Trailer to Static Pump used – NO

Water (loft) – Static to Loft Pump used – YES

Water Meter: 131 684.0

Toilet tank emptied: YES

ATV’s Used: 1,2,3 & Honda

Oil Added : NO

ATV Fuel Used: Gals

Hours the ATVs were Used today: 2h30

Notes on ATVs: –

Deimos rover used: NO

Hours: 113.2

Beginning charge: 100%

Ending charge: –

Currently charging: NO

Sojourner rover used: ASSIGNED TO DIRECTOR

Hours:

Beginning charge:

Ending charge:

Currently charging:

Spirit rover used: NO

Hours: 22.4

Beginning charge: 100%

Ending charge: –

Currently charging: YES

Opportunity rover used: NO

Hours: 18.0

Beginning charge: 100%

Ending charge: –

Currently charging: YES

Curiosity rover used: NO

Hours: 15.4

Beginning charge: 100%

Ending charge: –

Currently charging: NO

HabCar used and why, where –

General notes and comments: –

Summary of internet: –

Summary of suits and radios: –

Summary of Hab operations: –

Summary of GreenHab operations:

Summary of ScienceDome operations: –

Summary of RAMM operations:-

Summary of health and safety issues: –

Questions, concerns and requests to Mission Support: –

POSTED ONMARCH 4, 2018 Operations Report – March 4th Crew 189 Operations Report 4March2018

SOL: 14

Name of person filing report: Gabriel PAYEN

Non-nominal systems: –

Notes on non-nominal systems: –

Generator (hours run): Turned off at 08:45 and turned on at 1814

Solar— SOC 88 % (Before generator is run at night)

Diesel – 49 %

Propane – 25 psi.

Ethanol Free Gasoline (5 Gallon containers for ATV) – 3 gallons.

Water (trailer) – 0 gallons.

Water (static) – 550 gallons (100%)

Note : Dr Rupert and Atila realized that the tanks are 550 gallons one instead of 500.

Trailer to Static Pump used – NO

Water (loft) – Static to Loft Pump used – YES

Water Meter: 131 656.6

Toilet tank emptied: NO

ATV’s Used: NO

Oil Added : YES

ATV Fuel Used: Gals

Hours the ATVs were Used today: –

Notes on ATVs: The ATVs are full and ready to go

Deimos rover used: NO

Hours:

Beginning charge:

Ending charge:

Currently charging:

Sojourner rover used: ASSIGNED TO DIRECTOR

Hours:

Beginning charge:

Ending charge:

Currently charging:

Spirit rover used: NO

Hours:

Beginning charge:

Ending charge:

Currently charging:

Opportunity rover used: NO

Hours:

Beginning charge:

Ending charge:

Currently charging:

Curiosity rover used: NO

Hours:

Beginning charge:

Ending charge:

Currently charging:

HabCar used and why, where : Used to get 120 water, for garbage and to stored parts of the aquaponics system

General notes and comments: –

Summary of internet: –

Summary of suits and radios: –

Summary of Hab operations: –

Summary of GreenHab operations:

Summary of ScienceDome operations: –

Summary of RAMM operations:-

Summary of health and safety issues: –

Questions, concerns and requests to Mission Support: –

POSTED ONMARCH 1, 2018 Operations Report – March 1st Crew 189 Operations Report 1 March 2018

SOL: 11

Name of person filing report: Gabriel PAYEN Non-nominal systems: Pipe leak, radios Notes on non-nominal systems: – The pipe still leaks at the low deck – During the EVA, I was the HabCom and had troubles to communicates with EVA members: the range of emission of my radios (I tried three) were very short (~10 meters around the Hab) even if their reception worked well. It led to misunderstandings between EVA members and the Hab, fortunately without consequences (except a loss of time). Nevertheless, it could have worst issues in case of emergency, then we’ll do several checks (mainly about communication range) during the EVA planned tomorrow.

Generator (hours run): Generator turned off at 4:00 AM and turned on at 6:15 AM Solar— SOC – % (Before generator is run at night)

Diesel – Not checked Propane – 28 psi. Ethanol Free Gasoline (5 Gallon containers for ATV) – 5 gallons.

Water (trailer) – 0 gallons. Water (static) – 380 (~75%) gallons Trailer to Static Pump used – NO Water (loft) – Static to Loft Pump used – YES Water Meter: 131 570.2 Toilet tank emptied: NO

ATV’s Used: 1,2,3 & Honda Oil Added : NO

ATV Fuel Used: Gals

Hours the ATVs were Used today: 3 hours Notes on ATVs:

Deimos rover used: NO but back after being repaired Hours: 112.7 Beginning charge: 100% Ending charge: NA Currently charging: ?

Sojourner rover used: ASSIGNED TO DIRECTOR Hours: Beginning charge: Ending charge: Currently charging:

Spirit rover used: NO Hours: 21.9 Beginning charge: 100% Ending charge: NA Currently charging: YES

Opportunity rover used: NO Hours: 18.0 Beginning charge: 100% Ending charge: NA Currently charging: NO

Curiosity rover used: NO Hours: 15.3 Beginning charge: 100% Ending charge: NA Currently charging: YES

HabCar used and why, where : Used to get a load of 110 gallons and for garbage

General notes and comments: Summary of internet: Summary of suits and radios: – Summary of Hab operations: Summary of GreenHab operations: Summary of ScienceDome operations: Summary of RAMM operations: Summary of health and safety issues: Questions, concerns and requests to Mission Support:

POSTED ONFEBRUARY 27, 2018 Operations Report – February 27th Crew 189 Operations Report 27Feb2018

SOL: 9

Name of person filing report: PAYEN Gabriel

Non-nominal systems: Pipe leak, tires compressor

Notes on non-nominal systems:

-The pipe still leaks at the low deck

-During the EVA the crew tried to use the compress and blow front tires. It worked for the right rear wheel but failed for the right front wheel. A tip seems to miss on the compressor because it impossible to screw the compressor on the wheel tip firmly, so that we had to hold it with our hands.

Generator (hours run): Turned off at 9:00 AM and turned on at 7:00 PM

Solar— SOC 72 % (Before generator is run at night)

Diesel – 52%

Propane – 30 psi.

Ethanol Free Gasoline (5 Gallon containers for ATV) – 5 (50% each) gallons.

Water (trailer) – 0 gallons.

Water (static) – 400 (~80%) gallons

Trailer to Static Pump used – NO

Water (loft) – Static to Loft Pump used – YES

Water Meter: 131 505.9

Toilet tank emptied: NO

ATV’s Used: 1

Oil Added NO

ATV Fuel Used: Gals

Hours the ATVs were Used today: 30min

Notes on ATVs: –

Deimos rover used: NO

Hours:

Beginning charge:

Ending charge:

Currently charging:

Sojourner rover used: ASSIGNED TO DIRECTOR

Hours:

Beginning charge:

Ending charge:

Currently charging:

Spirit rover used: NO

Hours:

Beginning charge:

Ending charge:

Currently charging: YES

Opportunity rover used: NO

Hours: 18

Beginning charge: 100%

Ending charge: 100%

Currently charging: YES

Curiosity rover used: YES

Hours: Beginning of the EVA : 15.2 , end of the EVA : 15.3

Beginning charge: 100%

Ending charge: 99%

Currently charging: YES

HabCar used and why, where –

General notes and comments: –

Summary of internet: –

Summary of suits and radios:

Inventory of all working and non-working headsets/radios

Radios : All work

Headset : Two don’t work

Summary of Hab operations: –

Summary of GreenHab operations: –

Summary of ScienceDome operations: –

Summary of RAMM operations: –

Summary of health and safety issues: –

Questions, concerns and requests to Mission Support: –

POSTED ONFEBRUARY 26, 2018 Operations Report – February 26th Hello CapCom, Graeme,

Here is my Operation Report.

Crew 189 Operations Report 26Feb2018

SOL: 8

Name of person filing report: Gabriel PAYEN

Non-nominal systems: Pipe leak, radio

Notes on non-nominal systems:

-The pipe still leaks in the lower deck

-A radio became inaudible during the EVA

Generator (hours run): Turned off this morning and turned on at 6:45 PM

Solar— SOC % (Before generator is run at night) 85%

Diesel – Too dark to see

Propane – Too dark to see

Ethanol Free Gasoline (5 Gallon containers for ATV) – 5 gallons.

Water (trailer) – 0 gallons.

Water (static) – Between 400 and 450 gallons

Trailer to Static Pump used – NO

Water (loft) – Static to Loft Pump used – YES

Water Meter: 131 473.9

Toilet tank emptied: NO

ATV’s Used: 350.1 & 350.2

Oil Added : YES

ATV Fuel Used: Gals

Hours the ATVs were Used today: 3 hours

Notes on ATVs: –

Deimos rover used: NO

Hours:

Beginning charge:

Ending charge:

Currently charging:

Sojourner rover used: ASSIGNED TO DIRECTOR

Hours:

Beginning charge:

Ending charge:

Currently charging:

Spirit rover used: NO

Hours:

Beginning charge:

Ending charge:

Currently charging:

Opportunity rover used: NO

Hours:

Beginning charge:

Ending charge:

Currently charging:

Curiosity rover used: NO

Hours: Beginning of the EVA : 13.3 , End of the EVA : 13.7

Beginning charge: 100%

Ending charge: 87%

Currently charging: YES

HabCar used and why, where : –

General notes and comments: –

Summary of internet: –

Summary of suits and radios:

For the first time, our helmets stayed clear during the EVA and the fog quickly disappeared after every physical effort!

Summary of Hab operations: –

Summary of GreenHab operations: –

Summary of ScienceDome operations: –

Summary of RAMM operations: –

Summary of health and safety issues: –

Questions, concerns and requests to Mission Support: –

POSTED ONFEBRUARY 25, 2018 Operations Report – February 25th Crew 189 Operations Report 25Feb2018

SOL: 7

Name of person filing report: Gabriel PAYEN

Non-nominal systems:

-Pipe leak at the low desk

Notes on non-nominal systems:

-It seems that the pipe leak comes from the kitchen faucet.

Generator (hours run): Turned on at 9:AM and turned off at 6:00 PM

Solar— SOC % (Before generator is run at night) : 96%

Diesel – 55 %

Propane – 32 psi.

Ethanol Free Gasoline (5 Gallon containers for ATV) –

Water (trailer) – –

Water (static) – –

Trailer to Static Pump used – NO

Water (loft) – Static to Loft Pump used – YES

Water Meter: 131 439.1

Toilet tank emptied: NO

ATV’s Used: None

Oil Added –

ATV Fuel Used: Gals

Hours the ATVs were Used today: –

Notes on ATVs:

Deimos rover used: NO

Hours:

Beginning charge:

Ending charge:

Currently charging:

Sojourner rover used: ASSIGNED TO DIRECTOR

Hours:

Beginning charge:

Ending charge:

Currently charging:

Spirit rover used: NO

Hours:

Beginning charge:

Ending charge:

Currently charging:

Opportunity rover used: NO

Hours:

Beginning charge:

Ending charge:

Currently charging:

Curiosity rover used: NO

Hours:

Beginning charge:

Ending charge:

Currently charging:

HabCar used and why, where –

General notes and comments: –

Summary of internet: –

Summary of suits and radios: –

Summary of Hab operations: –

Summary of GreenHab operations: –

Summary of ScienceDome operations: –

Summary of RAMM operations: –

Summary of health and safety issues: –

Questions, concerns and requests to Mission Support: –

POSTED ONFEBRUARY 21, 2018 Operations Report – February 21st Crew 189 Operations Report 21/02/2018 SOL: 3

Name of person filing report: Gabriel PAYEN

Non-nominal systems: Pipe leak, Fans on backpack 2 & 6, roof heater, light bulb in the bathroom, hesitation about burnable/unburnable trashes.

-Pipe : The pipe in the low desk still leaks

-Roof Heater : It’s still difficult to control the heater

-Backpacks : All engineering checks were nominals, but during the EVA fans of backpack 2 and 6 turned out of service and both helmets were very foggy. Backpacks 2 and 6 joined backpacks 3 and 4 to the list of backpacks the crew need to fix. The crew was supposed to fix them today but the we were all very busy. I hope we’ll begin tomorrow.

-Light bulb : At 5:00 PM, a crew member was unable to light on the bulb in the bathroom. It seems that it is broken.

-Trashes : During the EVA engineering check, the EVA members had to but five wastes bags into the outside trashes but “Burnable” and “Unburnable” weren’t indicated. Therefore, they randomly put the wastes into the trashes, which is quite pity considering we do a selective sorting for wastes.

Generator (hours run): Turned of at 12:20 and turned on at 18:08

Solar— SOC % (Before generator is run at night) –

Diesel – 70 %

Propane – 39 psi.

Ethanol Free Gasoline (5 Gallon containers for ATV) – 7 gallons.

Water (trailer) – 0 gallons.

Water (static) – 300 gallons

Trailer to Static Pump used – NO

Water (loft) – Static to Loft Pump used – YES

Water Meter: 131 293.2

Toilet tank emptied: YES

ATV’s Used: 350.1 350.2

Oil Added : No

ATV Fuel Used: Gals

Hours the ATVs were Used today: 3 hours

Notes on ATVs: Because of the cold night, it took a few minutes to turn them on.

Deimos rover used: NO Hours: Beginning charge: Ending charge: Currently charging:

Spirit rover used: NO Hours: Beginning charge: Ending charge: Currently charging:

Opportunity rover used: YES Hours: 16.8 Beginning charge: 100% Ending charge: 75% Currently charging: YES

Curiosity rover used: NO Hours: Beginning charge: Ending charge: Currently charging:

HabCar used and why, where : NO

General notes and comments: –

Summary of internet: CapCom Bernard wanted some information about the Hab Router. I gave him it by email.

Summary of suits and radios: Backpack 2 & 6 put aside.

Summary of Hab operations: –

Summary of GreenHab operations: Jeremy (GreenHab officer) began to set the new shade with the help of other crew members.

Summary of ScienceDome operations: –

Summary of RAMM operations: –

Summary of health and safety issues: –

Questions, concerns and requests to Mission Support:

Bulb : Is it possible to have a new light bulb for the bathroom ? Brand, model and specifications of the old one : Lights of America – 2814 S – 120V 60Hz 14W 255mA

Pipe leak : Does a map of all Hab pipes exist ? I still don’t find were the leak comes from. I thought it could be a cooling or heating water, therefore I checked both heaters (roof and wall) today, and they are OK. The crew is out of ideas considering this leak (I also checked taps yesterday), therefore such a map can help me.

Trashes : The crew needs indications about trashes to know exactly in which ones burnable and unburnable wastes have to be put into.

POSTED ONFEBRUARY 21, 2018 Operations Report – February 21st Crew 189 Operations Report 21Feb2018 SOL: 2

Name of person filing report: PAYEN Gabriel

Non-nominal systems: Backpack 3

WiFi

Solar panels < 70% without generator running

Notes on non-nominal systems:

Backpack 3 :

All engineering checks were nominals, but during the EVA both fans turned out of service. Also, the necklace which holds the helmet was not stretched enough so that the helmet fell on the neck of Gabriel during half of the EVA.

Backpack 3 joined backpack 4 to the list of backpacks the crew need to fix. We’ll certainly begin to fix them tomorrow.

WiFi :

Only 15 Mo were left this morning (immediately after the very connection of the day were established). Yet, the leak is unknow. I reported the problem this morning and the crew have communicated with CapCom to find a solution.

Solar panels :

I had to go out of the SIM to turn on the generator at 6:20 PM. Solar SOC was at 53%, I hope batteries are not injured.

Generator (hours run): Turned of at 12:00 and turned on at 6:20PM.

Solar— SOC % (Before generator is run at night) /!\ 53%

Diesel – 70%

Propane – 40 psi.

Ethanol Free Gasoline (5 Gallon containers for ATV) – 7 gallons.

Water (trailer) – 0 gallons.

Water (static) – 65% gallons

Trailer to Static Pump used – NO

Water (loft) – Static to Loft Pump used – YES

Water Meter: 0.26m

Toilet tank emptied: NO

ATV’s Used: NO

Deimos rover used: YES

Hours: 109.1

Beginning charge: 100%

Ending charge: 100% (the EVA team doesn’t travel a lot)

Currently charging: YES

Spirit rover used: NO

Hours: 20.3

Beginning charge: 100%

Ending charge: 100%

Currently charging: NO

Opportunity rover used: YES

Hours: 16.6

Beginning charge: 100%

Ending charge: 45%

Currently charging: YES

Curiosity rover used: NO

Hours: 100%

Beginning charge: –

Ending charge: –

Currently charging: NO

General notes and comments: –

Summary of internet:

-Still seeking the leak.

Summary of suits and radios:

-Backpack 3 is put aside. Starting fixing backpack 3 and 4 tomorrow.

Summary of Hab operations:

-Two thermometers and the shape for the GreenHab received in the airlock. Jeremy (GreenHab officer) will set it up tomorrow.

-The pipe in the low desk seems not to flow anymore. All water devices in the Hab and GreenHab were tested one by one and none trigger the leak.

-Considering a Dr Rupert’s request, a mattress will be put in the airlock between 8PM and 9 PM.

Summary of GreenHab operations: –

Summary of ScienceDome operations: –

Summary of RAMM operations: –

Summary of health and safety issues: –

Questions, concerns and requests to Mission Support: –


POSTED ONFEBRUARY 20, 2018 Operations Report – February 20th Crew 189 Operations Report 20Feb2018 SOL: 2

Name of person filing report: PAYEN Gabriel

Non-nominal systems: Backpack 3

WiFi

Solar panels < 70% without generator running

Notes on non-nominal systems:

Backpack 3 :

All engineering checks were nominals, but during the EVA both fans turned out of service. Also, the necklace which holds the helmet was not stretched enough so that the helmet fell on the neck of Gabriel during half of the EVA.

Backpack 3 joined backpack 4 to the list of backpacks the crew need to fix. We’ll certainly begin to fix them tomorrow.

WiFi :

Only 15 Mo were left this morning (immediately after the very connection of the day were established). Yet, the leak is unknow. I reported the problem this morning and the crew have communicated with CapCom to find a solution.

Solar panels :

I had to go out of the SIM to turn on the generator at 6:20 PM. Solar SOC was at 53%, I hope batteries are not injured.

Generator (hours run): Turned of at 12:00 and turned on at 6:20PM.

Solar— SOC % (Before generator is run at night) /!\ 53%

Diesel – 70%

Propane – 40 psi.

Ethanol Free Gasoline (5 Gallon containers for ATV) – 7 gallons.

Water (trailer) – 0 gallons.

Water (static) – 65% gallons

Trailer to Static Pump used – NO

Water (loft) – Static to Loft Pump used – YES

Water Meter: 0.26m

Toilet tank emptied: NO

ATV’s Used: NO

Deimos rover used: YES

Hours: 109.1

Beginning charge: 100%

Ending charge: 100% (the EVA team doesn’t travel a lot)

Currently charging: YES

Spirit rover used: NO

Hours: 20.3

Beginning charge: 100%

Ending charge: 100%

Currently charging: NO

Opportunity rover used: YES

Hours: 16.6

Beginning charge: 100%

Ending charge: 45%

Currently charging: YES

Curiosity rover used: NO

Hours: 100%

Beginning charge: –

Ending charge: –

Currently charging: NO

General notes and comments: –

Summary of internet:

-Still seeking the leak.

Summary of suits and radios:

-Backpack 3 is put aside. Starting fixing backpack 3 and 4 tomorrow.

Summary of Hab operations:

-Two thermometers and the shape for the GreenHab received in the airlock. Jeremy (GreenHab officer) will set it up tomorrow.

-The pipe in the low desk seems not to flow anymore. All water devices in the Hab and GreenHab were tested one by one and none trigger the leak.

-Considering a Dr Rupert’s request, a mattress will be put in the airlock between 8PM and 9 PM.

Summary of GreenHab operations: –

Summary of ScienceDome operations: –

Summary of RAMM operations: –

Summary of health and safety issues: –

Questions, concerns and requests to Mission Support: –

POSTED ONFEBRUARY 19, 2018 Operations Report – February 19th Hi CapCom,

I’m Gabriel, and here is my Operation report.

Crew 189 Operations Report 19Feb2018

SOL: 1

Name of person filing report: Gabriel PAYEN

Non-nominal systems: Roof heater, pipe leak in low deck, ethernet hub, fan of backpack 4

Notes on non-nominal systems:

-Ethernet Hub :

This afternoon an experiment had trouble with an ethernet hub. We’ll try to fix it tonight or tomorrow.

-Fan :

During the engineering check all backpack seemed to be nominal but a fan on backpack 4 turned out of service during the EVA. Tomorrow the crew will be very busy, but we are planning an important backpack fixing operation during the upcoming days.

-Pipe leak :

The flow seems to be reduced, the bucket was empty this morning and at 50% tonight.

-Roof heater :

This morning it was very difficult to control the roof heater. Sometimes the flow became tepid or even cold without any reason because the furnace stops running. I’ve turned on the wall heater which runs all day.

Generator (hours run): All the day (turned on since 6:00 PM 18Feb) because of a cloudy day

Solar— SOC % (Before generator is run at night) 83% at 9 AM

Diesel – 70%

Propane – ?

Ethanol Free Gasoline (5 Gallon containers for ATV) – 7 gallons.

Water (trailer) – 0 gallons.

Water (static) – 400 gallons (checked during the EVA).

Trailer to Static Pump used – No but Atila gave a 100 gallons load

Water (loft) – Static to Loft Pump used – YES

Water Meter: 0.24m

Toilet tank emptied: NO

ATV’s Used: None

Deimos rover used: YES

Hours: 109.1

Beginning charge: 100%

Ending charge: 93%

Currently charging: YES

Spirit rover used: NO

Hours: 20.3

Beginning charge: 100%

Ending charge: 100%

Currently charging:

Opportunity rover used: YES

Hours: 15.7

Beginning charge: 100%

Ending charge: 85%

Currently charging: YES

Curiosity rover used: NO

Hours: 12.7

Beginning charge: 100%

Ending charge: 100%

Currently charging: NO

General notes and comments: Very busy today with my own experiments. As soon as possible (from sol 3 I hope) I’ll begin to deal with non-nominal systems (fan, pipe, hub, furnace…).

Questions, concerns and requests to Mission Support: –

POSTED ONFEBRUARY 18, 2018 Operations Report – February 18th Crew 189 Operations Report 18Feb2018

SOL: 0

Name of person filing report: Gabriel PAYEN

Non-nominal systems: Pipe leak in low deck, water heater, two thermometers in the Greenhab.

Notes on non-nominal systems: –

Generator (hours run): 14 hours during the night (7 PM to 9 AM)

Solar— SOC % (Before generator is run at night) : 91%

Diesel – ?

Propane – 46.2 psi.

Ethanol Free Gasoline (5 Gallon containers for ATV) – 7 gallons (estimation based the total height and capacity of the container)

Water (trailer) – 0 gallons.

Water (static) – 400 gallons (estimation based the total height and capacity of the tank)

Trailer to Static Pump used – No

Water (loft) – Static to Loft Pump used – Yes

Water Meter (loft) : 0.44, measurement at 7 PM

Toilet tank emptied: No

ATV’s Used: All ATVs used except the one which doesn’t work (I forgot to check its number)

Oil Added : No

ATV Fuel Used: Gals

  1. Hours the ATVs were Used today: 20min

Notes on ATVs: –

Deimos rover used: Yes

Hours: 108.7

Beginning charge: ? (not checked)

Ending charge: 98%

Currently charging: No

Spirit rover used: No

Hours: 20.2

Beginning charge: –

Ending charge: –

Currently charging: Yes (Atilia may have unplugged Curiosity to plug in Spirit)

Opportunity rover used: Yes

Hours: 15.3

Beginning charge: ? (not checked)

Ending charge: 93% (100% after being charged)

Currently charging: No

Curiosity rover used: No

Hours: 12.7

Beginning charge: 100%

Ending charge: 100%

Currently charging: No

HabCar used and why, where : Not used

General notes and comments: Last checks today with Shannon, some things to fix (see Non-nominal systems). Jérémy tried to run his aerosol counter device (LOAC) in the Hab but it doesn’t work. It turns on but doesn’t begin counting. The crew will try to fix it tomorrow.

Summary of internet: –

Summary of suits and radios: All air pipes had been tested and only one doesn’t work (backpack 3 – left one). All radios had been tested and work

Summary of Hab operations: –

Summary of GreenHab operations: –

Summary of ScienceDome operations: –

Summary of RAMM operations: –

Summary of health and safety issues: –

Questions, concerns and requests to Mission Support:

-Thermometers

The GreenHab officer would need a new thermometer.

-Pipe leaks

A bucket is beneath the pipe and receives a liquid which seems to be bad smelling water. Tape would stop the flow, but it only seems to be a temporary solution. Tomorrow I’ll try to find where the leak comes from.

-Water heater

Shannon seems to have fixed it before the very beginning of the SIM. We’ll see it when a crew member will take the first shower of the mission.

-Others:

Some checks have been forgotten (beginning charge of the rovers, numbers of ATVs used…). Sorry for that, I’ll try not to do theses mistakes anymore.


Source